Today we insulated and put up poly in Kate and Jonah's room.
Tuesday, December 30, 2014
Monday, December 29, 2014
Evan's Room Finished (12/28/14)
Today Mike hung the closet doors in Evan's new room.
I put 2 more coats of mud on the window, sanded it, and put the 2nd coat of paint on that wall finishing the room (except for trim sometime in the future)!
Mike also ran some duct work in various places in the downstairs ceiling.
In the last couple days Mike finished up the electrical and ran duct work in the new storage room. We moved our shelving and chest freezer into the new room and got it all loaded up. It feels good to have a permanent home for this stuff! We still have a lot of things boxed up that will eventually go in the kids new rooms or the family room and things to go through and get rid of; so our downstairs is still a big mess and packed with stuff.....but at least it feels like we are making some headway now!
I put 2 more coats of mud on the window, sanded it, and put the 2nd coat of paint on that wall finishing the room (except for trim sometime in the future)!
Paint is still a little wet around the window |
Mike also ran some duct work in various places in the downstairs ceiling.
In the last couple days Mike finished up the electrical and ran duct work in the new storage room. We moved our shelving and chest freezer into the new room and got it all loaded up. It feels good to have a permanent home for this stuff! We still have a lot of things boxed up that will eventually go in the kids new rooms or the family room and things to go through and get rid of; so our downstairs is still a big mess and packed with stuff.....but at least it feels like we are making some headway now!
Wednesday, December 24, 2014
Tuesday, December 23, 2014
Storage Room Door (12/22/14)
Today Mike put the door on the new storage room.
We also got the kids rooms all shifted around. Evan is officially in his new room and Jonah is sharing with Kate. First night in a toddler bed for Jonah!
Door to the left is storage room, other door is laundry room |
SOON they will have normal rooms...now we continue to make memories :) |
Monday, December 22, 2014
Monday, December 15, 2014
Sunday, December 14, 2014
Evan's Window Cut in (12/13/14)
Today Mike cut in the window in Evan's room. The sheetrock and framing on the inside still need to be taken out, but the big job of cutting out the concrete wall is done, and the opening framed!
P.S. It's 45* in December! All the snow we got in November is melted! Kids played outside all day without coats on! It's a great day to put in a window :)
P.S. It's 45* in December! All the snow we got in November is melted! Kids played outside all day without coats on! It's a great day to put in a window :)
2nd Coat of Paint in Evan's Room (12/12/14)
Today I painted the second coat of paint in Evan's room. I did all but the wall that the window is going in just in case I need to do any patching when the window goes in.
Friday, December 12, 2014
1st Coat on Evan's Room & Storage Room Sheetrocked (12/11/14)
Today I painted the first coat of paint in Evan's new room (formally Jonah's room).
Mike also patched the hole in the livingroom that he put in to fix the shower faucet.
This is where the new window will be cut in...hopefully this weekend |
Mike finished hanging the sheetrock in the new storage room and I did most of the taping.
Mike also patched the hole in the livingroom that he put in to fix the shower faucet.
Thursday, December 11, 2014
Jonah's Old Closet Wall Sanded (12/10/14)
Today I sanded the wall that we sheetrocked where the old closet in Jonah's room was. We also moved out a bunch of stuff from the room; once it is painted it will officially be Evan's room and Jonah and Kate will share until more bedrooms are done.
Wednesday, December 10, 2014
Closet Paint in Jonah's Room (12/9/14)
Today I painted the second coat on the walls in the closet in Jonah's room. I also painted the floor with a concrete sealer with 2 coats. Mike hung the rod and shelf.
Mike cut out the wall in the livingroom on the other side of the shower faucet to fix the leak. The water lines did not seal properly so he got them all sealed up and we will need to sheetrock this again....oh joy ;)
Concrete floor sealed |
2nd coat of paint done & rod/shelf hung |
I put the last coat of mud on the wall that the old closet was on. This wall is ready to be sanded now.
Mike cut out the wall in the livingroom on the other side of the shower faucet to fix the leak. The water lines did not seal properly so he got them all sealed up and we will need to sheetrock this again....oh joy ;)
Tuesday, December 9, 2014
Monday, December 8, 2014
Jonah's Closet Sanded (12/7/14)
Today I sanded the closet in Jonah's room so now it is ready to be painted.
Friday, December 5, 2014
Storage Room Insulated (12/4/14)
Today we insulated the outside walls in the new storage room downstairs. We also put up the poly over the insulation and got a start on the sheetrock.
Thursday, December 4, 2014
Shower Shelf (12/3/14)
Tonight Mike put in the glass shelf that we got for the insert we put in the shower in the upstairs bathroom.
He also wired up the light in our new storage room downstairs.
He also wired up the light in our new storage room downstairs.
Tuesday, December 2, 2014
Saturday, November 29, 2014
Closet Demo (11/28/14)
Wednesday, November 26, 2014
Tuesday, November 25, 2014
Saturday, November 22, 2014
Friday, November 21, 2014
...and there's a leak (11/20/14)
Today I taped all the seams in the closet in Jonah's room....and we discovered a leak :( The water lines in the shower in the upstairs bathroom did not seal properly and are slowly dripping. Mike got some spray sealer and sprayed it on the outside of the connections, hopefully this does the trick!