Tuesday, September 30, 2014

Plumbing Inspection, Insulation, & Sheetrock! (9/29/14)

Today we had our plumbing and framing inspection for the upstairs bathroom.  All went well so we can move on with sheetrocking the bathroom!  YAY!

We did some insulating in the walls and the ceiling.  More for noise on the walls since the bathroom is right in the center of the house and off the dining room. 

Mike got some sheetrock up and I started mudding.  We were planning on putting the toilet in right away but decided to leave it out so I can mud behind it easier.

Insulating!
Insulation in the ceiling
Vanity wall



Monday, September 29, 2014

Upstairs Bathroom Plumbing Done! (9/28/14)

Today Mike finished the plumbing in the upstairs bathroom.  YAY!  Feels so good to be done with it!  He had to go up in the attic and run the vent pipe through the roof.  He also put in the water lines for the toilet and framed up the wall behind the toilet.



Sunday, September 28, 2014

Toilet Plumbing (9/27/14)

Today Mike got the old plumbing removed and the new plumbing run for the toilet and the vent for the sump basin under the steps.  




Friday, September 26, 2014

It's a 1 toilet house...(9/25/14)

Well we're down to one toilet again.  Mike took out the toilet in the upstairs bathroom so he can work on the plumbing for it.  We were hoping to have our plumbing inspection Friday so the toilet could go right back on, but taking out all the old stuff took a lot longer than he expected so now he will finish it over the weekend and we'll have an inspection on Monday....so no toilet upstairs until Monday night!


Thursday, September 25, 2014

Staining Steps (9/24/14)

Today I got the side step, back step, and the deck under the canopy stained.  







Mike got the plumbing run to the sump basin that is under the steps for the plumbing in the wet bar and the washing machine.  

Wednesday, September 24, 2014

Upstairs Bathroom Water Lines (9/23/14)

Tonight Mike ran the water lines for the shower and the sink in the upstairs bathroom.  



I got the back step, side step, and deck under the canopy washed so I can stain them.

I also went shopping and picked out the tile for the bathroom.  Such a hard choice, but I picked what I've been visioning in my head this whole time.  Now that we have the tile I'm not so sure about my choices so I really hope I like them!

This is the tile for the floor, it is tile that looks like wood!

Tuesday, September 23, 2014

Trees & Bathroom Vents (9/22/14)

Today we planted our new trees!






Mike got more plumbing done in the upstairs bathroom.  He got the vent pipe run for for the shower and connected to the sink vent.  Now they just need to be vented through the attic and roof.