Over the last couple weeks Mike put up some more base trim downstairs.
Thursday, June 23, 2016
Sunday, June 5, 2016
Outside Window Trim & Rocks in Window Wells (6/4/16)
Monday, May 30, 2016
Down-Spouts Finished & Downstairs Trim (5/25/16)
Tonight Mike finished up the last 2 down-spouts on the gutters.
He also replaced a part on the air-conditioner hoping it would fix it, but it didn't do the trick. Ever since we moved it from it's original location it hasn't worked right. He called someone to come out and look at it next week.
I painted some trim for downstairs today and Mike was able to put it up tonight.
He also replaced a part on the air-conditioner hoping it would fix it, but it didn't do the trick. Ever since we moved it from it's original location it hasn't worked right. He called someone to come out and look at it next week.
I painted some trim for downstairs today and Mike was able to put it up tonight.
Tuesday, May 24, 2016
2 of 4 Down-Spouts Done (5/23/16)
Tonight Mike finished putting all the clips on the rest of the gutters. He also put up 2 of the 4 down-spouts. 2 left to go and the gutters will be complete!
Monday, May 23, 2016
Gutters Up (5/22/16)
Today we finished putting up the gutters on the rest of the front of the house and the garage side. Mike got them all sealed up with caulk and has to finish putting some clips on some sides, then he will work on the down-spouts.
Sunday, May 22, 2016
Gutters (5/21/16)
Today we started on the gutters. We got up the following sections:
Above the side door
Back of the house
Side with master bedroom & office
Above office window
Monday, May 16, 2016
Laundry Chute (5/15/16)
Today Mike made some metals panels for the inside of the laundry chute and put the outside trim on it. We had some extra doors from the bathroom closet that were not made correctly from our cabinet maker, so Mike was able to cut one down and make it into the door for the laundry chute. He just needs to clean it up and repaint it.
| The door |
Subscribe to:
Posts (Atom)