Downstairs Bathroom Concrete & Electrical (12/13/13)

Tonight Mike cut out more of the concrete floor in the new downstairs bathroom.  There's a lot to cut and it's not very fun to cut so he's taking it a little at a time until it's done.  

Sink area
Cut out for toilet

So we were potentially going to get a bathtub from Mike's friend, Jason; so Mike cut out the hole in the floor for that tub.....the drain for the tub upstairs that we were originally planning on bringing down is on the other side.  We found out today that his friend doesn't have the tub anymore so we will be using the tub from upstairs.....no biggie but oh joy he gets to cut more concrete now!

I wrapped up some of the electrical that we did in the back addition downstairs and Mike hung the new electrical panel.