Starting the Downstairs Concrete (1/16/14)

Today Mike picked up the concrete bag mix from Menards on 2 separate trips.  He hauled it all downstairs, we calculated that getting it from Menards into the Suburban and then hauling it downstairs, Mike lifted 7600 lbs!!!!  He's got some sore muscles!!  Once he gets all poured into the floor that # will be doubled!  Holy workout!!

After getting all the concrete hauled down, Mike was able to start some concrete mixing and pouring!  There wasn't much I could help with besides getting the water to mix it up.

The kids were really excited to see the pouring so they got to stay up extra late and watch!  They were some pretty happy kids!

56 bags of concrete!
Concrete mixing...Mike only got his finger caught in the gear once - good thing he had gloves on but it still got munched!
Happy kids!


Pouring the concrete around the toilet
Water girl
Tub & toilet holes filled
Kitchen sink run done
Under bathroom vanity done