Framing & Electrical in Kate's Room (2/22/15)
Yesterday Mike ran the air conditioner line, it went through Kate's room since the air conditioner is sitting on that side of the house. The line needed to be run before we could frame the wall with the window.
Today we framed the wall with the window, the closet, and around all the duct work. I ran the electrical as Mike framed, including 2 outlets in Evan's room. We have a little more framing and electrical to get done and then will have both our electrical and framing inspections.
|
Closet |
|
View to the closet |
No comments:
Post a Comment